Hi All,
It's been several weeks since our last Apache Karaf 2.2.x patch update. During this time we have collected 12 resolved issues. I'd like to schedule in a Karaf 2.2.8 RC build for mid to late June time frame, which should allow enough time for currently in progress issues to be resolved. Current high lights of this patch include updates to Pax Web 1.0.11, Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do not expect to see new features appear on the 2.2.x line. I do not believe producing this patch will impact development efforts on any of the other branches or sub projects. Cheers, Jamie |
|
Hi Jamie,
+1 There is no Pax web 1.0.12 in the queue so I'm fine with this. regards, Achim 2012/6/11 Jamie G. <[hidden email]>: > Hi All, > > It's been several weeks since our last Apache Karaf 2.2.x patch > update. During this time we have collected 12 resolved issues. I'd > like to schedule in a Karaf 2.2.8 RC build for mid to late June time > frame, which should allow enough time for currently in progress issues > to be resolved. > > Current high lights of this patch include updates to Pax Web 1.0.11, > Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do > not expect to see new features appear on the 2.2.x line. > > I do not believe producing this patch will impact development efforts > on any of the other branches or sub projects. > > Cheers, > Jamie -- Apache Karaf <http://karaf.apache.org/> Committer & PMC OPS4J Pax Web <http://wiki.ops4j.org/display/paxweb/Pax+Web/> Committer & Project Lead OPS4J Pax for Vaadin <http://team.ops4j.org/wiki/display/PAXVAADIN/Home> Commiter & Project Lead blog <http://notizblog.nierbeck.de/> |
|
+1 from me too; nevertheless I think you should add the aries bug-fix
upgrades to your list of important upgrades too; those will make such things as offline cxf with blueprint work! Kind regards, Andreas On Mon, Jun 11, 2012 at 2:15 PM, Achim Nierbeck <[hidden email]> wrote: > Hi Jamie, > > +1 > There is no Pax web 1.0.12 in the queue so I'm fine with this. > > regards, Achim > > 2012/6/11 Jamie G. <[hidden email]>: >> Hi All, >> >> It's been several weeks since our last Apache Karaf 2.2.x patch >> update. During this time we have collected 12 resolved issues. I'd >> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >> frame, which should allow enough time for currently in progress issues >> to be resolved. >> >> Current high lights of this patch include updates to Pax Web 1.0.11, >> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >> not expect to see new features appear on the 2.2.x line. >> >> I do not believe producing this patch will impact development efforts >> on any of the other branches or sub projects. >> >> Cheers, >> Jamie > > > > -- > > Apache Karaf <http://karaf.apache.org/> Committer & PMC > OPS4J Pax Web <http://wiki.ops4j.org/display/paxweb/Pax+Web/> > Committer & Project Lead > OPS4J Pax for Vaadin > <http://team.ops4j.org/wiki/display/PAXVAADIN/Home> Commiter & Project > Lead > blog <http://notizblog.nierbeck.de/> |
|
In reply to this post by jgoodyear
Hi Jamie,
Agree with that but IMHO we have some issues to fix before: KARAF-1521 KARAF-1410 KARAF-1392 KARAF-1386 KARAF-1327 On the other hand, I think: - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 will be used (I will do that this afternoon) - I'm working on Karaf trunk (around sub-shell) to be able to create the karaf-3.0.x branch and make a first RC My schedule proposal is: - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut off for Wednesday, 13rd - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on Thursday, 14th - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening or over the week end WDYT ? Regards JB On 06/11/2012 02:12 PM, Jamie G. wrote: > Hi All, > > It's been several weeks since our last Apache Karaf 2.2.x patch > update. During this time we have collected 12 resolved issues. I'd > like to schedule in a Karaf 2.2.8 RC build for mid to late June time > frame, which should allow enough time for currently in progress issues > to be resolved. > > Current high lights of this patch include updates to Pax Web 1.0.11, > Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do > not expect to see new features appear on the 2.2.x line. > > I do not believe producing this patch will impact development efforts > on any of the other branches or sub projects. > > Cheers, > Jamie -- Jean-Baptiste Onofré [hidden email] http://blog.nanthrax.net Talend - http://www.talend.com |
|
Hi JB,
+1 for all especially for cutting the RC1 of Karaf 3.0.0 :D regards, Achim 2012/6/11 Jean-Baptiste Onofré <[hidden email]>: > Hi Jamie, > > Agree with that but IMHO we have some issues to fix before: > > KARAF-1521 > KARAF-1410 > KARAF-1392 > KARAF-1386 > KARAF-1327 > > On the other hand, I think: > - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 will > be used (I will do that this afternoon) > - I'm working on Karaf trunk (around sub-shell) to be able to create the > karaf-3.0.x branch and make a first RC > > My schedule proposal is: > - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut off > for Wednesday, 13rd > - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on > Thursday, 14th > - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening or > over the week end > > WDYT ? > > Regards > JB > > > On 06/11/2012 02:12 PM, Jamie G. wrote: >> >> Hi All, >> >> It's been several weeks since our last Apache Karaf 2.2.x patch >> update. During this time we have collected 12 resolved issues. I'd >> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >> frame, which should allow enough time for currently in progress issues >> to be resolved. >> >> Current high lights of this patch include updates to Pax Web 1.0.11, >> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >> not expect to see new features appear on the 2.2.x line. >> >> I do not believe producing this patch will impact development efforts >> on any of the other branches or sub projects. >> >> Cheers, >> Jamie > > > -- > Jean-Baptiste Onofré > [hidden email] > http://blog.nanthrax.net > Talend - http://www.talend.com -- Apache Karaf <http://karaf.apache.org/> Committer & PMC OPS4J Pax Web <http://wiki.ops4j.org/display/paxweb/Pax+Web/> Committer & Project Lead OPS4J Pax for Vaadin <http://team.ops4j.org/wiki/display/PAXVAADIN/Home> Commiter & Project Lead blog <http://notizblog.nierbeck.de/> |
|
In reply to this post by jbonofre
I need to have sshd release out for 2.3.0.
I've also fixed a bug in fileinstall so it may be a good idea to include it in 2.2 and 2.3. I can start the release process this week. On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré <[hidden email]> wrote: > Hi Jamie, > > Agree with that but IMHO we have some issues to fix before: > > KARAF-1521 > KARAF-1410 > KARAF-1392 > KARAF-1386 > KARAF-1327 > > On the other hand, I think: > - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 will > be used (I will do that this afternoon) > - I'm working on Karaf trunk (around sub-shell) to be able to create the > karaf-3.0.x branch and make a first RC > > My schedule proposal is: > - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut off > for Wednesday, 13rd > - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on > Thursday, 14th > - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening or > over the week end > > WDYT ? > > Regards > JB > > > On 06/11/2012 02:12 PM, Jamie G. wrote: >> >> Hi All, >> >> It's been several weeks since our last Apache Karaf 2.2.x patch >> update. During this time we have collected 12 resolved issues. I'd >> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >> frame, which should allow enough time for currently in progress issues >> to be resolved. >> >> Current high lights of this patch include updates to Pax Web 1.0.11, >> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >> not expect to see new features appear on the 2.2.x line. >> >> I do not believe producing this patch will impact development efforts >> on any of the other branches or sub projects. >> >> Cheers, >> Jamie > > > -- > Jean-Baptiste Onofré > [hidden email] > http://blog.nanthrax.net > Talend - http://www.talend.com -- ------------------------ Guillaume Nodet ------------------------ Blog: http://gnodet.blogspot.com/ ------------------------ FuseSource, Integration everywhere http://fusesource.com |
|
It makes sense.
I will update as soon as we have sshd and fileinstall releases available. Let us know when you can cut off these releases. Thanks Regards JB On 06/11/2012 02:22 PM, Guillaume Nodet wrote: > I need to have sshd release out for 2.3.0. > I've also fixed a bug in fileinstall so it may be a good idea to > include it in 2.2 and 2.3. I can start the release process this week. > > On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> wrote: >> Hi Jamie, >> >> Agree with that but IMHO we have some issues to fix before: >> >> KARAF-1521 >> KARAF-1410 >> KARAF-1392 >> KARAF-1386 >> KARAF-1327 >> >> On the other hand, I think: >> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 will >> be used (I will do that this afternoon) >> - I'm working on Karaf trunk (around sub-shell) to be able to create the >> karaf-3.0.x branch and make a first RC >> >> My schedule proposal is: >> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut off >> for Wednesday, 13rd >> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >> Thursday, 14th >> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening or >> over the week end >> >> WDYT ? >> >> Regards >> JB >> >> >> On 06/11/2012 02:12 PM, Jamie G. wrote: >>> >>> Hi All, >>> >>> It's been several weeks since our last Apache Karaf 2.2.x patch >>> update. During this time we have collected 12 resolved issues. I'd >>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>> frame, which should allow enough time for currently in progress issues >>> to be resolved. >>> >>> Current high lights of this patch include updates to Pax Web 1.0.11, >>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>> not expect to see new features appear on the 2.2.x line. >>> >>> I do not believe producing this patch will impact development efforts >>> on any of the other branches or sub projects. >>> >>> Cheers, >>> Jamie >> >> >> -- >> Jean-Baptiste Onofré >> [hidden email] >> http://blog.nanthrax.net >> Talend - http://www.talend.com > > > -- Jean-Baptiste Onofré [hidden email] http://blog.nanthrax.net Talend - http://www.talend.com |
|
The sshd process has been started.
I'll try to do fileinstall and felix utils (which is needed) this week. Btw, I also plan to release jline 2.7 this week which includes a couple of fixes and enhancements, so that could be included in 2.3 and 3.0 too. On Mon, Jun 11, 2012 at 2:24 PM, Jean-Baptiste Onofré <[hidden email]> wrote: > It makes sense. > > I will update as soon as we have sshd and fileinstall releases available. > > Let us know when you can cut off these releases. > > Thanks > Regards > JB > > > On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >> >> I need to have sshd release out for 2.3.0. >> I've also fixed a bug in fileinstall so it may be a good idea to >> include it in 2.2 and 2.3. I can start the release process this week. >> >> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >> wrote: >>> >>> Hi Jamie, >>> >>> Agree with that but IMHO we have some issues to fix before: >>> >>> KARAF-1521 >>> KARAF-1410 >>> KARAF-1392 >>> KARAF-1386 >>> KARAF-1327 >>> >>> On the other hand, I think: >>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>> will >>> be used (I will do that this afternoon) >>> - I'm working on Karaf trunk (around sub-shell) to be able to create the >>> karaf-3.0.x branch and make a first RC >>> >>> My schedule proposal is: >>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut >>> off >>> for Wednesday, 13rd >>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >>> Thursday, 14th >>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening >>> or >>> over the week end >>> >>> WDYT ? >>> >>> Regards >>> JB >>> >>> >>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>> >>>> >>>> Hi All, >>>> >>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>> update. During this time we have collected 12 resolved issues. I'd >>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>> frame, which should allow enough time for currently in progress issues >>>> to be resolved. >>>> >>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>> not expect to see new features appear on the 2.2.x line. >>>> >>>> I do not believe producing this patch will impact development efforts >>>> on any of the other branches or sub projects. >>>> >>>> Cheers, >>>> Jamie >>> >>> >>> >>> -- >>> Jean-Baptiste Onofré >>> [hidden email] >>> http://blog.nanthrax.net >>> Talend - http://www.talend.com >> >> >> >> > > -- > Jean-Baptiste Onofré > [hidden email] > http://blog.nanthrax.net > Talend - http://www.talend.com -- ------------------------ Guillaume Nodet ------------------------ Blog: http://gnodet.blogspot.com/ ------------------------ FuseSource, Integration everywhere http://fusesource.com |
|
Ok, it gives us the time to fix the pending issues.
Regards JB On 06/11/2012 02:32 PM, Guillaume Nodet wrote: > The sshd process has been started. > I'll try to do fileinstall and felix utils (which is needed) this week. > Btw, I also plan to release jline 2.7 this week which includes a > couple of fixes and enhancements, so that could be included in 2.3 and > 3.0 too. > > On Mon, Jun 11, 2012 at 2:24 PM, Jean-Baptiste Onofré<[hidden email]> wrote: >> It makes sense. >> >> I will update as soon as we have sshd and fileinstall releases available. >> >> Let us know when you can cut off these releases. >> >> Thanks >> Regards >> JB >> >> >> On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >>> >>> I need to have sshd release out for 2.3.0. >>> I've also fixed a bug in fileinstall so it may be a good idea to >>> include it in 2.2 and 2.3. I can start the release process this week. >>> >>> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >>> wrote: >>>> >>>> Hi Jamie, >>>> >>>> Agree with that but IMHO we have some issues to fix before: >>>> >>>> KARAF-1521 >>>> KARAF-1410 >>>> KARAF-1392 >>>> KARAF-1386 >>>> KARAF-1327 >>>> >>>> On the other hand, I think: >>>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>>> will >>>> be used (I will do that this afternoon) >>>> - I'm working on Karaf trunk (around sub-shell) to be able to create the >>>> karaf-3.0.x branch and make a first RC >>>> >>>> My schedule proposal is: >>>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut >>>> off >>>> for Wednesday, 13rd >>>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >>>> Thursday, 14th >>>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening >>>> or >>>> over the week end >>>> >>>> WDYT ? >>>> >>>> Regards >>>> JB >>>> >>>> >>>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>>> >>>>> >>>>> Hi All, >>>>> >>>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>>> update. During this time we have collected 12 resolved issues. I'd >>>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>>> frame, which should allow enough time for currently in progress issues >>>>> to be resolved. >>>>> >>>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>>> not expect to see new features appear on the 2.2.x line. >>>>> >>>>> I do not believe producing this patch will impact development efforts >>>>> on any of the other branches or sub projects. >>>>> >>>>> Cheers, >>>>> Jamie >>>> >>>> >>>> >>>> -- >>>> Jean-Baptiste Onofré >>>> [hidden email] >>>> http://blog.nanthrax.net >>>> Talend - http://www.talend.com >>> >>> >>> >>> >> >> -- >> Jean-Baptiste Onofré >> [hidden email] >> http://blog.nanthrax.net >> Talend - http://www.talend.com > > > -- Jean-Baptiste Onofré [hidden email] http://blog.nanthrax.net Talend - http://www.talend.com |
|
In reply to this post by jbonofre
+1 waiting for FileInstall bug fix for Karaf 2.2.8.
+1 waiting for FileInstall and jline bug fix for karaf 2.3.0. As to the list of issues for 2.2.8, lets bump the remaining issues to 2.2.9. Regarding Karaf 3.0.0.RC1 and 3.0.x branch; when trunk is branched to 3.0.x, trunk will become 3.1.0-snapshot? Looking forward to getting karaf 3 on the road towards its full RC status. Should we add to the release notes something along the lines of "3.0.0.RC1 is considered a beta trail release of Karaf 3.0.x"?, just to ensure everyone is aware that this release is not for production use? Cheers, Jamie On Mon, Jun 11, 2012 at 9:54 AM, Jean-Baptiste Onofré <[hidden email]> wrote: > It makes sense. > > I will update as soon as we have sshd and fileinstall releases available. > > Let us know when you can cut off these releases. > > Thanks > Regards > JB > > > On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >> >> I need to have sshd release out for 2.3.0. >> I've also fixed a bug in fileinstall so it may be a good idea to >> include it in 2.2 and 2.3. I can start the release process this week. >> >> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >> wrote: >>> >>> Hi Jamie, >>> >>> Agree with that but IMHO we have some issues to fix before: >>> >>> KARAF-1521 >>> KARAF-1410 >>> KARAF-1392 >>> KARAF-1386 >>> KARAF-1327 >>> >>> On the other hand, I think: >>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>> will >>> be used (I will do that this afternoon) >>> - I'm working on Karaf trunk (around sub-shell) to be able to create the >>> karaf-3.0.x branch and make a first RC >>> >>> My schedule proposal is: >>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut >>> off >>> for Wednesday, 13rd >>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >>> Thursday, 14th >>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening >>> or >>> over the week end >>> >>> WDYT ? >>> >>> Regards >>> JB >>> >>> >>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>> >>>> >>>> Hi All, >>>> >>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>> update. During this time we have collected 12 resolved issues. I'd >>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>> frame, which should allow enough time for currently in progress issues >>>> to be resolved. >>>> >>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>> not expect to see new features appear on the 2.2.x line. >>>> >>>> I do not believe producing this patch will impact development efforts >>>> on any of the other branches or sub projects. >>>> >>>> Cheers, >>>> Jamie >>> >>> >>> >>> -- >>> Jean-Baptiste Onofré >>> [hidden email] >>> http://blog.nanthrax.net >>> Talend - http://www.talend.com >> >> >> >> > > -- > Jean-Baptiste Onofré > [hidden email] > http://blog.nanthrax.net > Talend - http://www.talend.com |
|
+1 for the note in the release
On Mon, Jun 11, 2012 at 2:36 PM, Jamie G. <[hidden email]> wrote: > +1 waiting for FileInstall bug fix for Karaf 2.2.8. > +1 waiting for FileInstall and jline bug fix for karaf 2.3.0. > > As to the list of issues for 2.2.8, lets bump the remaining issues to 2.2.9. > > Regarding Karaf 3.0.0.RC1 and 3.0.x branch; when trunk is branched to > 3.0.x, trunk will become 3.1.0-snapshot? > > Looking forward to getting karaf 3 on the road towards its full RC > status. Should we add to the release notes something along the lines > of "3.0.0.RC1 is considered a beta trail release of Karaf 3.0.x"?, > just to ensure everyone is aware that this release is not for > production use? > > Cheers, > Jamie > > On Mon, Jun 11, 2012 at 9:54 AM, Jean-Baptiste Onofré <[hidden email]> wrote: >> It makes sense. >> >> I will update as soon as we have sshd and fileinstall releases available. >> >> Let us know when you can cut off these releases. >> >> Thanks >> Regards >> JB >> >> >> On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >>> >>> I need to have sshd release out for 2.3.0. >>> I've also fixed a bug in fileinstall so it may be a good idea to >>> include it in 2.2 and 2.3. I can start the release process this week. >>> >>> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >>> wrote: >>>> >>>> Hi Jamie, >>>> >>>> Agree with that but IMHO we have some issues to fix before: >>>> >>>> KARAF-1521 >>>> KARAF-1410 >>>> KARAF-1392 >>>> KARAF-1386 >>>> KARAF-1327 >>>> >>>> On the other hand, I think: >>>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>>> will >>>> be used (I will do that this afternoon) >>>> - I'm working on Karaf trunk (around sub-shell) to be able to create the >>>> karaf-3.0.x branch and make a first RC >>>> >>>> My schedule proposal is: >>>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut >>>> off >>>> for Wednesday, 13rd >>>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >>>> Thursday, 14th >>>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening >>>> or >>>> over the week end >>>> >>>> WDYT ? >>>> >>>> Regards >>>> JB >>>> >>>> >>>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>>> >>>>> >>>>> Hi All, >>>>> >>>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>>> update. During this time we have collected 12 resolved issues. I'd >>>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>>> frame, which should allow enough time for currently in progress issues >>>>> to be resolved. >>>>> >>>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>>> not expect to see new features appear on the 2.2.x line. >>>>> >>>>> I do not believe producing this patch will impact development efforts >>>>> on any of the other branches or sub projects. >>>>> >>>>> Cheers, >>>>> Jamie >>>> >>>> >>>> >>>> -- >>>> Jean-Baptiste Onofré >>>> [hidden email] >>>> http://blog.nanthrax.net >>>> Talend - http://www.talend.com >>> >>> >>> >>> >> >> -- >> Jean-Baptiste Onofré >> [hidden email] >> http://blog.nanthrax.net >> Talend - http://www.talend.com -- ------------------------ Guillaume Nodet ------------------------ Blog: http://gnodet.blogspot.com/ ------------------------ FuseSource, Integration everywhere http://fusesource.com |
|
In reply to this post by jgoodyear
+1 (it's exactly the purpose ;))
Regards JB On 06/11/2012 02:36 PM, Jamie G. wrote: > +1 waiting for FileInstall bug fix for Karaf 2.2.8. > +1 waiting for FileInstall and jline bug fix for karaf 2.3.0. > > As to the list of issues for 2.2.8, lets bump the remaining issues to 2.2.9. > > Regarding Karaf 3.0.0.RC1 and 3.0.x branch; when trunk is branched to > 3.0.x, trunk will become 3.1.0-snapshot? > > Looking forward to getting karaf 3 on the road towards its full RC > status. Should we add to the release notes something along the lines > of "3.0.0.RC1 is considered a beta trail release of Karaf 3.0.x"?, > just to ensure everyone is aware that this release is not for > production use? > > Cheers, > Jamie > > On Mon, Jun 11, 2012 at 9:54 AM, Jean-Baptiste Onofré<[hidden email]> wrote: >> It makes sense. >> >> I will update as soon as we have sshd and fileinstall releases available. >> >> Let us know when you can cut off these releases. >> >> Thanks >> Regards >> JB >> >> >> On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >>> >>> I need to have sshd release out for 2.3.0. >>> I've also fixed a bug in fileinstall so it may be a good idea to >>> include it in 2.2 and 2.3. I can start the release process this week. >>> >>> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >>> wrote: >>>> >>>> Hi Jamie, >>>> >>>> Agree with that but IMHO we have some issues to fix before: >>>> >>>> KARAF-1521 >>>> KARAF-1410 >>>> KARAF-1392 >>>> KARAF-1386 >>>> KARAF-1327 >>>> >>>> On the other hand, I think: >>>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>>> will >>>> be used (I will do that this afternoon) >>>> - I'm working on Karaf trunk (around sub-shell) to be able to create the >>>> karaf-3.0.x branch and make a first RC >>>> >>>> My schedule proposal is: >>>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the cut >>>> off >>>> for Wednesday, 13rd >>>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release on >>>> Thursday, 14th >>>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday evening >>>> or >>>> over the week end >>>> >>>> WDYT ? >>>> >>>> Regards >>>> JB >>>> >>>> >>>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>>> >>>>> >>>>> Hi All, >>>>> >>>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>>> update. During this time we have collected 12 resolved issues. I'd >>>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>>> frame, which should allow enough time for currently in progress issues >>>>> to be resolved. >>>>> >>>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>>> not expect to see new features appear on the 2.2.x line. >>>>> >>>>> I do not believe producing this patch will impact development efforts >>>>> on any of the other branches or sub projects. >>>>> >>>>> Cheers, >>>>> Jamie >>>> >>>> >>>> >>>> -- >>>> Jean-Baptiste Onofré >>>> [hidden email] >>>> http://blog.nanthrax.net >>>> Talend - http://www.talend.com >>> >>> >>> >>> >> >> -- >> Jean-Baptiste Onofré >> [hidden email] >> http://blog.nanthrax.net >> Talend - http://www.talend.com -- Jean-Baptiste Onofré [hidden email] http://blog.nanthrax.net Talend - http://www.talend.com |
|
I've added 2.2.9 and 3.0.0.RC1 versions to our Karaf Jira.
I'd suggest using the 3.0.0.RC1 version for tracking all issues required for getting the preview prepared (3.0.0 remaining for the full release). Cheers, Jamie On Mon, Jun 11, 2012 at 10:08 AM, Jean-Baptiste Onofré <[hidden email]> wrote: > +1 (it's exactly the purpose ;)) > > Regards > JB > > > On 06/11/2012 02:36 PM, Jamie G. wrote: >> >> +1 waiting for FileInstall bug fix for Karaf 2.2.8. >> +1 waiting for FileInstall and jline bug fix for karaf 2.3.0. >> >> As to the list of issues for 2.2.8, lets bump the remaining issues to >> 2.2.9. >> >> Regarding Karaf 3.0.0.RC1 and 3.0.x branch; when trunk is branched to >> 3.0.x, trunk will become 3.1.0-snapshot? >> >> Looking forward to getting karaf 3 on the road towards its full RC >> status. Should we add to the release notes something along the lines >> of "3.0.0.RC1 is considered a beta trail release of Karaf 3.0.x"?, >> just to ensure everyone is aware that this release is not for >> production use? >> >> Cheers, >> Jamie >> >> On Mon, Jun 11, 2012 at 9:54 AM, Jean-Baptiste Onofré<[hidden email]> >> wrote: >>> >>> It makes sense. >>> >>> I will update as soon as we have sshd and fileinstall releases available. >>> >>> Let us know when you can cut off these releases. >>> >>> Thanks >>> Regards >>> JB >>> >>> >>> On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >>>> >>>> >>>> I need to have sshd release out for 2.3.0. >>>> I've also fixed a bug in fileinstall so it may be a good idea to >>>> include it in 2.2 and 2.3. I can start the release process this week. >>>> >>>> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >>>> wrote: >>>>> >>>>> >>>>> Hi Jamie, >>>>> >>>>> Agree with that but IMHO we have some issues to fix before: >>>>> >>>>> KARAF-1521 >>>>> KARAF-1410 >>>>> KARAF-1392 >>>>> KARAF-1386 >>>>> KARAF-1327 >>>>> >>>>> On the other hand, I think: >>>>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>>>> will >>>>> be used (I will do that this afternoon) >>>>> - I'm working on Karaf trunk (around sub-shell) to be able to create >>>>> the >>>>> karaf-3.0.x branch and make a first RC >>>>> >>>>> My schedule proposal is: >>>>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the >>>>> cut >>>>> off >>>>> for Wednesday, 13rd >>>>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release >>>>> on >>>>> Thursday, 14th >>>>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday >>>>> evening >>>>> or >>>>> over the week end >>>>> >>>>> WDYT ? >>>>> >>>>> Regards >>>>> JB >>>>> >>>>> >>>>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>>>> >>>>>> >>>>>> >>>>>> Hi All, >>>>>> >>>>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>>>> update. During this time we have collected 12 resolved issues. I'd >>>>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>>>> frame, which should allow enough time for currently in progress issues >>>>>> to be resolved. >>>>>> >>>>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>>>> not expect to see new features appear on the 2.2.x line. >>>>>> >>>>>> I do not believe producing this patch will impact development efforts >>>>>> on any of the other branches or sub projects. >>>>>> >>>>>> Cheers, >>>>>> Jamie >>>>> >>>>> >>>>> >>>>> >>>>> -- >>>>> Jean-Baptiste Onofré >>>>> [hidden email] >>>>> http://blog.nanthrax.net >>>>> Talend - http://www.talend.com >>>> >>>> >>>> >>>> >>>> >>> >>> -- >>> Jean-Baptiste Onofré >>> [hidden email] >>> http://blog.nanthrax.net >>> Talend - http://www.talend.com > > > -- > Jean-Baptiste Onofré > [hidden email] > http://blog.nanthrax.net > Talend - http://www.talend.com |
|
Thanks,
Regards JB On 06/11/2012 03:04 PM, Jamie G. wrote: > I've added 2.2.9 and 3.0.0.RC1 versions to our Karaf Jira. > > I'd suggest using the 3.0.0.RC1 version for tracking all issues > required for getting the preview prepared (3.0.0 remaining for the > full release). > > Cheers, > Jamie > > On Mon, Jun 11, 2012 at 10:08 AM, Jean-Baptiste Onofré<[hidden email]> wrote: >> +1 (it's exactly the purpose ;)) >> >> Regards >> JB >> >> >> On 06/11/2012 02:36 PM, Jamie G. wrote: >>> >>> +1 waiting for FileInstall bug fix for Karaf 2.2.8. >>> +1 waiting for FileInstall and jline bug fix for karaf 2.3.0. >>> >>> As to the list of issues for 2.2.8, lets bump the remaining issues to >>> 2.2.9. >>> >>> Regarding Karaf 3.0.0.RC1 and 3.0.x branch; when trunk is branched to >>> 3.0.x, trunk will become 3.1.0-snapshot? >>> >>> Looking forward to getting karaf 3 on the road towards its full RC >>> status. Should we add to the release notes something along the lines >>> of "3.0.0.RC1 is considered a beta trail release of Karaf 3.0.x"?, >>> just to ensure everyone is aware that this release is not for >>> production use? >>> >>> Cheers, >>> Jamie >>> >>> On Mon, Jun 11, 2012 at 9:54 AM, Jean-Baptiste Onofré<[hidden email]> >>> wrote: >>>> >>>> It makes sense. >>>> >>>> I will update as soon as we have sshd and fileinstall releases available. >>>> >>>> Let us know when you can cut off these releases. >>>> >>>> Thanks >>>> Regards >>>> JB >>>> >>>> >>>> On 06/11/2012 02:22 PM, Guillaume Nodet wrote: >>>>> >>>>> >>>>> I need to have sshd release out for 2.3.0. >>>>> I've also fixed a bug in fileinstall so it may be a good idea to >>>>> include it in 2.2 and 2.3. I can start the release process this week. >>>>> >>>>> On Mon, Jun 11, 2012 at 2:19 PM, Jean-Baptiste Onofré<[hidden email]> >>>>> wrote: >>>>>> >>>>>> >>>>>> Hi Jamie, >>>>>> >>>>>> Agree with that but IMHO we have some issues to fix before: >>>>>> >>>>>> KARAF-1521 >>>>>> KARAF-1410 >>>>>> KARAF-1392 >>>>>> KARAF-1386 >>>>>> KARAF-1327 >>>>>> >>>>>> On the other hand, I think: >>>>>> - Karaf 2.3.0 will be ready to release as soon as Felix ConfigAdmin 1.4 >>>>>> will >>>>>> be used (I will do that this afternoon) >>>>>> - I'm working on Karaf trunk (around sub-shell) to be able to create >>>>>> the >>>>>> karaf-3.0.x branch and make a first RC >>>>>> >>>>>> My schedule proposal is: >>>>>> - Karaf 2.2.8 => 2 days to fix the pending issues, we can plan the >>>>>> cut >>>>>> off >>>>>> for Wednesday, 13rd >>>>>> - Karaf 2.3.0 => same plan as 2.2.8, why not cut off a first release >>>>>> on >>>>>> Thursday, 14th >>>>>> - Karaf 3.0.0.RC1 and 3.0.x branch, I plan to cut off that Friday >>>>>> evening >>>>>> or >>>>>> over the week end >>>>>> >>>>>> WDYT ? >>>>>> >>>>>> Regards >>>>>> JB >>>>>> >>>>>> >>>>>> On 06/11/2012 02:12 PM, Jamie G. wrote: >>>>>>> >>>>>>> >>>>>>> >>>>>>> Hi All, >>>>>>> >>>>>>> It's been several weeks since our last Apache Karaf 2.2.x patch >>>>>>> update. During this time we have collected 12 resolved issues. I'd >>>>>>> like to schedule in a Karaf 2.2.8 RC build for mid to late June time >>>>>>> frame, which should allow enough time for currently in progress issues >>>>>>> to be resolved. >>>>>>> >>>>>>> Current high lights of this patch include updates to Pax Web 1.0.11, >>>>>>> Pax-Logging 1.6.7, and Jansi 1.9. As we have the 2.3.x branch, I do >>>>>>> not expect to see new features appear on the 2.2.x line. >>>>>>> >>>>>>> I do not believe producing this patch will impact development efforts >>>>>>> on any of the other branches or sub projects. >>>>>>> >>>>>>> Cheers, >>>>>>> Jamie >>>>>> >>>>>> >>>>>> >>>>>> >>>>>> -- >>>>>> Jean-Baptiste Onofré >>>>>> [hidden email] >>>>>> http://blog.nanthrax.net >>>>>> Talend - http://www.talend.com >>>>> >>>>> >>>>> >>>>> >>>>> >>>> >>>> -- >>>> Jean-Baptiste Onofré >>>> [hidden email] >>>> http://blog.nanthrax.net >>>> Talend - http://www.talend.com >> >> >> -- >> Jean-Baptiste Onofré >> [hidden email] >> http://blog.nanthrax.net >> Talend - http://www.talend.com -- Jean-Baptiste Onofré [hidden email] http://blog.nanthrax.net Talend - http://www.talend.com |